Timing points is designed to automatically reduce the pressure of gas, and further maintaining it at a predetermined level regardless of the flow variations within the rated figures. Consider the features of EMG.
Hydraulic fracturing are divided according to the method of placing equipment in the following types:
The Fundamental difference between hydraulic fracturing of the latter type is that they are not the typical product to factory readiness.
Timing points with pressure up to 0.6 MPa in utility and industrial plants, boiler houses, stand alone, housed in buildings near the input of the pipeline, in the premises, which is gas-powered equipment. GRU is prohibited to install under stair flights.
Device gas distribution points in the basement, the basement of the buildings, appurtenances to buildings such as hospitals, schools, kindergartens, administrative and residential buildings is not permitted.
Recommended
Staff evaluation: system and methods
Personnel Assessment allows you to identify how competent the employees involved in the enterprise, and it is the performance of their work – the most significant factor affecting the efficiency of the company. To clarify the impact of performa...
How to start your own business: important aspects.
Many people, tired of working for someone else, are increasingly thinking about how to start your own business. Someone wants to open a salon, someone store, and someone enough and vegetable stalls. Before you throw in the pool with his head, it is i...
Business activities. its essence and basic functions
The Entrepreneurial activity of the citizen – is undertaken at your own risk and independent activity, which aims to systematically profit through the sale of works, goods, services, use of the property. The citizen engaged in such activities, ...
Separately located hydraulic fracturing should have one floor and roof combined. The roof should be legkousvaivaemyh (weight of 1 m of the ceiling – is not more than 120 kg).
Not allowed to install ventilation and flues in separating ceilings and walls of buildings to which is attached a Timing point. All premises shall be provided with artificial and natural lighting, constant ventilation system (natural) with a triple air exchange.
Lighting and electrical equipment are made of flameproof materials. The inputs of the power supply networks must be cable.
In the regulatory hall can accommodate telephone. However, he needs to be protected from explosions.
When mounting the local heating system placed in an isolated room with a separate exit. It must be separated from other areas Timing point Solid walls of fireproof and gastight materials. The temperature should be no more than 130, heating equipment – 95 degrees.
For the PIU should be provided for lightning protection. The floors are made of materials that prevent the formation of sparks.
On the facade of the building in a conspicuous place strike a warning label "Flammable". The letters shall be in height not less than 300 mm.
The Door of the gas-distributing point outwards. Canvas sheathed galvanized steel (0.8 mm thick).
It is with hydraulic fracturing. The equipment of gas-distributing point includes:
Before the shut-off valve is set to bypass (bypass pipeline) with 2 shut-off devices arranged in series. By-pass gas during inspection and repair of the equipment on the lines. For points with pressure greater than 0.6 MPa, and high (over 5 thousand m/h) bandwidth of the bypass pipeline is installed an additional line regulation.
Using special measuring tools to determine:
They are used to vent gas to atmosphere and venting equipment. Purge the pipelines are installed at:
Piping output to places where it is safe dispersion of the gas (at least 1 m above the eaves of structures).
By locking devices shall be capable of disabling the timing points, measuring instruments and equipment without shutting down the gas supply.
The fracture can be single or double. In the first input pressure is adjusted to output one, the second, respectively, the two regulators installed in series. The device performance should be about the same.
Single-stage models are used, typically, when the difference of the indices of the input and output pressure in the range of 0.6 MPa.
Parts of the selection pulse for regulators and safety shut-off valves are identified in the passport of the equipment, but they can change.
It is carried out by written order recorded in the plugin log. Before starting to read the contents of the works that have been made since the stop and also the reasons for the termination of hydraulic fracturing.
The start is done in 2 steps:
It must say:
Also during the inspection you must ensure that:
We are open:
Next specialist:
The journal entry is made on works performed.
Article in other languages:
KK: https://tostpost.com/kk/biznes/39520-gaz-taratu-punkt-rylysy-paydalanu-a-oyylatyn-talaptar.html
PL: https://tostpost.com/pl/biznes/41224-rozrz-d-polecenie-urz-dzenie-wymagania-do-pracy.html
TR: https://tostpost.com/tr/business/36029-her-madde-cihaz-kullan-m-gereksinimleri.html
UK: https://tostpost.com/uk/b-znes/39952-gazorozpod-l-niy-punkt-pristr-y-vimogi-do-ekspluatac.html
Alin Trodden - author of the article, editor
"Hi, I'm Alin Trodden. I write texts, read books, and look for impressions. And I'm not bad at telling you about it. I am always happy to participate in interesting projects."
Related News
Kamensk-Uralsky metallurgical plant: history, description, products
JSC «Kamensk-Uralsky metallurgical plant" (KUMZ) was created with the goal of providing airlines the products from a special magnesium and high-strength aluminum alloys. Today the company has significantly expanded the ...
Igor Korshunov and Leverage Investments: move to live in summer
Probably everyone thought about a vacation in a warm country by the sea. Maybe even about life in Cyprus. Igor Korshunov sure – it all depends on you.In search of a suitable country available for a comfortable life Russian m...
The time of delivery by Mail Russia: rules and nuances
Those who sent/awaiting a postal parcel, are concerned about delivery time. Also not everyone understands, how to track a shipment, what should I do if there is no data about the location of things.Often it happens that you have a...
the T-34 at the time of its inception in 1940, meets the highest requirements for this type of weapons. Mounted on the tank 76-mm gun easily struck all the existing tanks in the world. During the war the German designers radically...
Knee-type milling machine: device, circuits, and types
knee-type milling machine – one of the most common types of equipment. The fixture design includes a slide and a working console. The movement of the working part is carried out in three directions: longitudinally, verticall...
Yakutskaya GRES: basic characteristics modernization
Yakutskaya GRES — the main source of electricity in the Republic of Sakha. The world's first power plant built on permafrost. A real point it also the only one on earth like object working in the climatic zone, where the dif...