Building a master plan: development, structure, types

Date:

2018-03-27 14:12:19

Views:

814

Rating:

1Like 0Dislike

Share:

Table of contents:

The site Plan, where is the exact location of all projects under construction, arrangement and mounting of the lifting mechanisms, as well as many other household objects, is a General construction plan. It lists the warehouses of construction materials, mortar and concrete nodes, the temporary premises of cultural-household, sanitary-hygienic and administrative purposes, communication networks, energy supply, water and the like.

construction master plan

Types

The area Covered and level of detail affect the type belongs to a General construction plan. It can be an object or obdiplostemony. For major construction projects, including water management, construction General layout of these types is not limited to, a mandatory component of situational, which are characterized by conditions regarding construction management.

The site plan indicates not only the location of the construction, but existing on-premises construction:

  • Career, where mined sand and gravel;
  • The factories where the concrete structures, brick and metal structures;
  • All communications: water, rail, road, power lines and more.

Building a master plan of drainage and irrigation systems in addition has indicate the boundaries and area of drained and irrigated areas. Also, the plan should indicate the order of entry of each node and the boundaries of operational and construction sites, border water drainage and flooding areas, all bridges and bypass channels.

Recommended

Insurance for pregnant women when traveling abroad: features, views, and reviews

Insurance for pregnant women when traveling abroad: features, views, and reviews

Currently, in our country there is a huge number of insurance companies that are willing to provide the necessary services at any time. Insurance expectant mothers – is a separate activity that SK are doing very reluctantly. The fact is that pr...

Construction company

Construction company "Rosstroyinvest": feedback from real estate investors. LCD "Old fortress". LCD "Golden domes"

One of the most promising participants in the Russian real estate market, particularly in the joint construction, is the "Rosstroyinvest". Reviews of investors are saying about the leading role of the construction company year of Foundation, in 2002,...

The conditions for obtaining credit in modern banking institutions

The conditions for obtaining credit in modern banking institutions

Any aspiring entrepreneur is faced with the problem of insufficient funding of their own business. Currently, this problem can be solved by knowing the terms of the loan and taking the necessary amount from the Bank. This method is best for solving p...

construction master plan

Planning

Development and construction of the master plan begins with a list of objects of economic activities which have maximum use in construction. This is the power supply company, construction of various buildings for the needs of construction and so on. If such objects do not exist or their capacity is insufficient, then designed a similar temporary purpose of the structure. Develop a General construction plan obselescence type covers the entire territory of the construction site and includes absolutely all objects.

The Plan consists of graphics and explanatory note with justification of each decision to the graphical part, which includes a detailed plan of the construction site, operation of permanent and temporary objects, symbols, and fragments of a plan, process flow diagrams. In addition, in the graphical part of the design and construction of the master plan presupposes the existence of technical and economic parameters and notes. Scale obselescence construction plan can be 1:5000, 1:2000 or 1:1000.

Consistency

The General plan of the construction site usually start up the host roads for the domestic construction vehicles, at the same time, the planned location of mechanical units and obdiplostemony warehouses. Only then can you place all the main building and household objects. After the completion of this work the General plan of the construction object are projected temporary mains electricity, water, heating.

When you perform all this design work should be guided by the results of the calculation data needs objects and special rules posting them. For example, the calculation of the construction of the master plan should take into account that the distance from points of supply to domestic premises should not exceed six hundred meters (here you need to focus on rules), to household and sanitary premises should not be more than two hundred metres, and the production of works not less than fifty meters. Also under existing rules, planned fire breaks between areas and between warehouses.

designing construction master plan

Design Stage

The construction master plans must include the requirements in those or other resources, as well as in construction and industrial facilities. All this is contained in the explanatory Memorandum. In obselesence construction master plan this information is usually given approximately, based on the rules.

During the construction of water management and hydraulic engineering structures must show all the devices and structures that provide the cost of construction water during construction, as well as a breakdown of the sequence of all works on complex erection or Assembly of hydraulic structures.

Is single-stage design, which is usually associated with small construction projects, then not be prepared obdiplostemony construction master plan. Types of stagepiano mostly listed left to speak specifically about the second of the key.

Object construction master plan

Developing It, as has been said, particularly on each object from the ones shown in obselesence. Object strojjgenplan can be made for each of the work stages: preparatory period, zero cycle, the erection of the aerial part. In the graphic part of it contains the same elements as inobdiplostemony, but each issue is studied in much greater detail.

Scaling is often the same. Construction and household objects are placed in the same way as in designing obselescence plan, be sure to be consistent with established rules and accepted calculations. The only difference is that the approximate calculations can not be, because there is the base of the natural volume of work, norms of expenses of resources and so on.

General plan of the construction site

Compilation

Starts designing of the object of the General plan, often with the installation of lifting devices and machines and their specific and rational allocation. Then it will be clear how to set locations for storage of construction materials, prefabricated structures, where to place vnutribrjushinnye road. After completion of these project works are placed, and other elements of construction in accordance with the list (SNiP 3.01.01.85).

When erected a variety of buildings or structures, construction sites should be not only the data objects under construction, and numerous temporary auxiliary buildings necessary for the needs of the construction, the so-called construction management. For the building of a transport path and the road well-positioned office and industrial buildings, different mechanical setup, warehouses, a network of pipelines, water supply network.

Purpose

Building a master plan exists in order to best provide the construction site with all the necessary conditions - domestic and industrial, in time to have been receiving, storage, shipping for each job need building materials, semi-products and products.

It is Necessary that normally worked, all construction tools and machines, to the smooth construction of the supplied heat, water and electricity. Building a master plan reflects the decision of questions of construction safety, occupational safety, fire prevention and lighting throughout the construction site in the dark.

General plan for the construction of the object

Temporary buildings

Site built among persistent objects occupy a special place of the building that is used only during the construction period. Their construction is designed in the first place, and after construction they will be dismantled or demolished. Also temporary structures are considered to be Railways and roads on the construction site.

For Example, rails for tower cranes will necessarily be removed when they are no longer necessary. All the warehouses for materials and products, and utilities, exterior lighting, fire hydrants, fences building sites - all this will be after the construction is removed.

The Differences in the plans

Judging by the composition, construction master plans differ from each other at each stage of the work that is complete item detail and exact location of all temporary and permanent structures.

During the development special attention is paid to the rational use of the construction site, minimize the cost of temporary structures and buildings, good location on site of all necessary for the functioning of the economy. It is of great importance to environmental issues.

the calculation of the construction master plan

Source data

For design of construction master plans, the most important is the following: size, location and nature of the object of construction, dimensions, and topography, characteristics of materials, designs and details used in the construction, types of mechanization to be used, and the methods of installation of structures. Mandatory calendar schedule for the construction of the object, or network.

The terrain of the construction site depends very much: the placement of temporary and permanent facilities, optimal directions of Railways and roads, sewage management, and storm water from the construction site. Climatological baseline data must match the selection of the type of premises for storage (they can be closed, or open), as well as and places where they should be located. For example, open warehouses with dusty materials or flammable equip to leeward.

Stages

The Design of building master plan usually contains three stages. First, determine the composition of all temporary structures, then outline the locations of all elements of construction, and finally perform precise calculations.

When you design a General construction plan, it necessarily correlate with the General plan, where designated engineering networks that already exist, because it is impossible to place temporary structures on the padded seat of communications. Also it gives the possibility of using permanent networks for the needs of construction.

part of a General construction plans

Roads, storage facilities

The Roads within the construction site are to easy travel and exit of transport and loading and unloading. Roadnetwork necessarily provides an annular passage. The width of the roadway of temporary roads is determined based on the transport systems involved. Often temporary roads are constructed from concrete inventory of plates, stacked in two rows.

Warehousing can be arranged according to the draft strojjgenplan. Warehouses can be:

  • Heated and there;
  • Enclosed spaces;
  • In the open or under the eaves of the sites.

The designed Capacity, depending on the amount of materials and the storage conditions. The warehouses at the construction site are divided into on-site and obdiplostemony. The latter are of the closed type, designed for high-value and perishable materials (glass, paint, fixtures, etc.).


Article in other languages:

AR: https://tostpost.com/ar/finance/11284-building-a-master-plan-development-structure-types.html

BE: https://tostpost.com/be/f-nansy/20209-buda-n-chy-general-ny-plan-raspraco-ka-sklad-v-dy.html

DE: https://tostpost.com/de/finanzen/20227-bau-masterplan-die-entwicklung-zusammensetzung-arten.html

ES: https://tostpost.com/es/finanzas/20240-de-construcci-n-el-plan-de-desarrollo-la-composici-n-los-tipos-de.html

HI: https://tostpost.com/hi/finance/11293-building-a-master-plan-development-structure-types.html

JA: https://tostpost.com/ja/finance/11293-building-a-master-plan-development-structure-types.html

KK: https://tostpost.com/kk/arzhy/20209-rylys-bas-zhosparyn-z-rleu-ramy-t-rler.html

PL: https://tostpost.com/pl/finanse/20181-budowlany-plan-opracowanie-sk-ad-rodzaje.html

PT: https://tostpost.com/pt/finan-as/20183-a-constru-o-de-um-plano-geral-de-desenvolvimento-composi-o-tipos-de.html

TR: https://tostpost.com/tr/maliye/20213-n-aat-master-plan-tasar-m-kompozisyon-t-r.html

UK: https://tostpost.com/uk/f-nansi/20203-bud-vel-niy-general-niy-plan-rozrobka-sklad-vidi.html

ZH: https://tostpost.com/zh/finance/12065-building-a-master-plan-development-structure-types.html






Alin Trodden - author of the article, editor
"Hi, I'm Alin Trodden. I write texts, read books, and look for impressions. And I'm not bad at telling you about it. I am always happy to participate in interesting projects."

Comments (0)

This article has no comment, be the first!

Add comment

Related News

Is it possible loan refinancing with a bad credit history? How to refinance with bad credit history?

Is it possible loan refinancing with a bad credit history? How to refinance with bad credit history?

Making “a big and expensive” the loan, many borrowers do not even believe that they can expect the fate of the defaulters. However, time passes and at some stage they are facing with financial problems. Credit history ...

Binary options 24option: reviews. 24option: reviews negative

Binary options 24option: reviews. 24option: reviews negative

Broker 24option reviews of services which is increasingly positive due to the high level of service, is one of the largest companies offering services in the field of binary options trading in the world. The actions of the company...

Cottage village

Cottage village "White Beach" in the Moscow region: reviews, prices

Each year in the Metropolitan area appear new cottages. This is due to the high demand for suburban real estate. Tired of the smog and noise of the Muscovites rush to the countryside to enjoy the peace and fresh air. One of the "t...

Why it doesn't work Kivi-purse lately? The tricks of swindlers

Why it doesn't work Kivi-purse lately? The tricks of swindlers

Why it doesn't work Kivi-purse from spring 2014? This question is of serious concern to many Internet users and clients of the payment system Kiwi (QIWI). A couple of months not only are there failures, but terminal. What are the ...

How to recharge the card “Arrow” via the Internet: step by step instructions and recommendations

How to recharge the card “Arrow” via the Internet: step by step instructions and recommendations

For trips on public transportation in the capital region with 1.02.2015 year become card “Arrow” that allow you to pay for services in cash. It is very convenient for all citizens, since it is only necessary to Deposit...

What types of houses offers us the real estate market today?

What types of houses offers us the real estate market today?

a Few years ago for many regions of our country have been the actual problem is a shortage of residential property. Today, such is no shortage-the housing market is filled with proposals in the segments of secondary apartments and...