Stonehenge in England, the Peruvian citadel of Machu Picchu, the pyramids of the pharaohs in Egypt – all those great works of ancient architecture bears witness to the fact that natural stone is one of the oldest and at the same time durable building materials in human history. But working with him is very difficult, it's heavy to carry and extremely time-consuming in processing and installing.

Stonehenge.Machu Picchu,Pamidi.Chapel to South Africa

It would be nice to have similar material in the form of the batter, giving it a free form, which after curing would have acquired the properties of the stone. Such an amazing "liquid rock" exists, and we call it concrete. It is a composite material comprising three major elements.

Three simple components of an ideal building material

  • Cement (the common name for the silicates and aluminates of calcium) – takes 10-15 % of the total volume of the solution.
  • Water – 15-20 %.
  • Mixture of coarse and fine aggregate (sand, gravel, large pieces of crushed rocks, recycled glass, etc) – usually 60-75 %.
    concrete

Speaking of the concrete as a composite material, you need to understand that the ingredients are so different from the final product have high strength and durability are not simply a result of the drying of the solution, and thanks to a chemical reaction. When adding water start to grow crystals of hydrate of cement, forming a crystal lattice and tightly bonding the sand and gravel. Because of this, after pouring concrete you have to moisturize for several days, and getting a good result is possible only at observance of a number of technological requirements.

Recommended

The most effective methods of seed germination

The most effective methods of seed germination

Despite the fact that the method of seedling in vegetable production is a very time consuming process, it is used by most gardeners. Planting seeds in open ground is an easy and convenient method, but it is effective only in certain climatic zones. I...

Retro-reflective paint. The scope of

Retro-reflective paint. The scope of

When the vehicle began to fill the road, their popularity began to gain reflective paint. Thanks to this paint, as drivers and pedestrians becomes much easier to avoid accidents in the dark. Purpose paint Reflective paint – paint material, whic...

How to make icon with your own hands - options izgotovleniya (simple and complex)

How to make icon with your own hands - options izgotovleniya (simple and complex)

In Soviet times, many collecting badges, emblems, pennants. To get them was not easy. And today, thanks to technology, you can make them yourself. Knowing how to make icon with your own hands, and you can make original gifts to your friends, and make...

Two stages of "growing up" of concrete

Due to the fact that this building material is "born" in the liquid state, forms for concrete can be moulded almost in any desired configuration, after which, as a result of hydration, the setting, and then the stage of concrete hardening.

  • Seizure – perhaps the most important and quite transient process beginning approximately two hours after solidification of the solution and ending an hour after this (at 20ºC). This period is very much dependent on the pouring temperature of concrete, for example, at 0ºC can take up to 20 hours, and the heat time interval setting, on the contrary, significantly reduced.
  • Hardening – a non-linear process proceeding most rapidly in the first stage, when the concrete, approximately during the month, gaining most of his strength, while the final solidification occurs only in a few years.

Everyone has flaws, but the iron rod inside will solve any problem

At Once it is necessary to understand that it is better to pour the concrete prepared with the industrial method, by purchasing it from a trusted manufacturer to ensure its compliance with the claimed mark. The only way to obtain material that meets a pre-defined customer requirements, reflected in the passport of the concrete (density, fraction of filler, frost resistance, water resistance, the mobility of the mixture).

One of the main characteristics that determined the wide use of concrete is its ability to withstand considerable physical stress in compression. This figure corresponds to the density determined by the ratio of the mass of material to volume. In severe grades of solution with a filler made of natural stone of various fractions (gravel, pebbles, or gravel), the weight of one cube of concrete ranges from 1.8 to 2.5 tons. Materials of this type are used in the construction of structures subject to considerable loads (columns, slabs, foundations, etc.). For lightweight concrete, used for construction and insulation of walls, floors and ceilings light weight, as a filler serve as perlite, expanded clay and various foam and sponge. The density of such a solution varies from 0.6 to 1.8 t/m3.

Unfortunately, the big drawback of concrete is that the tensile load it can withstand about 10 times smaller than in compression, and easily destroyed even with a slight bending. This problem is solved by pouring the concrete around the twisted steel rods (rebar) bonded to each other in the form of a lattice.

Concrete design

After curing is obtained a new composite material-reinforced concrete in which the concrete provides the compressive strength while the steel resists bending and stretching. Sometimes used for reinforcement of other materials, including various types of plastics, but the steel strain in the heat or cold is about the same as concrete, and this means that the material will not break down from the inside.

The Fundamental basis of concrete longevity

It is Clear that in a number of objective reasons is not appropriate or possible in the order of a solution from a professional supplier. Moreover, observing the technical conditions, even while pouring the concrete with your hands, you can get a good result.

The Foundation of the house – it is the basis and guarantee trouble-free functioning of allhe aims to support. There are lots of ways of its tabs from the block and pile – to create a monolithic belt with reinforced belt. However, with all the richness of choice in all these cases, it will be concrete, but rather – reinforced concrete. In the case of individual construction the most common is the last of these options. While pouring the Foundation concrete is a continuous layer around the perimeter of the future building, over a reinforcing frame.

All work on the construction of the Foundation can be divided into three stages.

  1. Preparatory – site planning, installation of rebar and formwork Assembly.
  2. Work on pouring concrete-mixing, the supply, laying mortar and concrete curing.
  3. Final – dismantling of formwork, visual control and elimination of small defects.

Foundation: looking for answers to many questions

The overall dimensions of the Foundation, in addition to its obvious parameter-the length will depend on many initial conditions: load bearing (the type of wall material, number of storeys, presence of a basement), soil type, topography, groundwater level, depth of soil freezing, snow cover, and more.

prepare the Foundation for pouring

When it comes to the minimum dimensions, the depth of the Foundation should not be less than half a meter, the stem above the ground of 30 cm and a width of at least one and a half times the size of the masonry wall material.

Form: the story is about how the form determines the content

Formwork consists of a shield part and the stop. During its formation it is necessary to consider that the concrete in the first stage – is a fluid solution that fills all available space. Because to obtain good result of panel surface should be as smooth and not contain cracks and rifts, and to meet the ideal vertical is recommended to use Builder's level or plumb. At home the shields for formwork made of pine boards with a cross-section of 20-25 mm, sewn together with a strap of the same material, as well as plywood, chipboard or metal sheets.

Formwork for strip Foundation

It is extremely important not to forget about another property of concrete, namely, its high specific weight, because the thickness of the panel formwork elements and the stop (usually wood) must provide compensation for the pressure of the concrete mass. In addition, it is desirable to lubricate the working surface of the shields with grease or covered with plastic sleeve, ensuring perfect smoothness of the Foundation, will eliminate the leakage of solution in the crevice of the casing and facilitate its subsequent removal.

the Reinforcement of the Foundation

The Framework of reinforcement must guarantee inextricably tying across the surface of the future Foundation, as a rule, one cubic meter of concrete depending on the diameter accounted for 70 to 120 kg reinforcement bars.

The Secret of making concrete potions

In the next stage, start actually preparing a mixture for concrete. Since we are talking about private construction, the measuring unit will use the classical two-gallon bucket. Grade of concrete depends on the proportions of its constituent materials and for the Foundation is most often used M300. Such a solution corresponds to the following proportions: for 1 bucket of Portland cement grade 400 have 2 buckets of sand and 4 of gravel. The amount of water depends strongly on the moisture content of sand and is calculated experimentally when the first batch. Then all the ingredients are thoroughly mixed in a large bowl or mixer. The ready solution must have a homogeneous viscous consistency, does not leak through the joints of the formwork, and it is well to fill all voids.

The Order of laying of concrete mixes

To Lay a concrete mixture should be horizontal uniform layers, height of about 20 cm, distributing the solution across the width of the formwork, and avoiding gaps. This is a very time-consuming and dynamic process, because to achieve the perfect solidity of the Foundation of the next layer of concrete should be applied until the setting of the previous batch. At the same time during pouring (in the absence of the deep vibrator) the solution need to constantly move and to pierce an iron rod or scrap to fill all cavities and deaeration of the concrete to obtain a uniform strength of the Foundation.

Healthy “childhood” of the concrete determines its long life

Immediately after the completion of the fill phase begins care with concrete mix, which depending on weather conditions it takes three to five days. First and foremost, this applies to periodic (every 2-4 hours) moistening of the concrete surface. The higher the temperature, the this should be done more often, but if work performed during the cool time of year and the temperature ranges from 0 to +5ºC, watering is not doing at all, protecting fresh concrete from direct sunlight and temperature extremes by using wet sand or sawdust. Also need the first two to three days to avoid walking on flooded surfaces and to protect her from other mechanical damage. Most quickly the strength of concrete increases in the first days, and after a week and a halfis about 70% from the stated vintage of indicators (28 days).

Now you can carefully remove the formwork and to evaluate the result. In case of detection of shells and corner chipping, the surface of the Foundation overwritten by the solution based on sand and cement, and excess sagging can be removed by using a trowel.

Concrete, like always on top

All the advantages of concrete has found its application in the construction of floors. It is primarily strength, evenness, moisture resistance and durability, and a relatively high thermal conductivity in combination with the active use in our days radiant heating systems from faults gradually moved into one of the priorities of the use of such type of materials.

Laying concrete screed

The technology of pouring the floor concrete is even easier described above, the device strip Foundation. The key point here is the qualitative preparation of the coated surface, which implies the presence of strong bases, the creation of the membrane and insulation for the future of sex. In fact, the role of the formwork in this case itself acts as fill area and the walls of the room, while standard coating thickness of from 6 to 8 cm, the entire process will not take much time. In addition, such works often use lightweight concrete or fine fillers with lower relative used in the Foundation of the brand. As reinforcement of masonry used wire mesh, and the main difficulty lies in the perfect setting of the guide beacons, which can serve as trimming the original pipe. Due to the significant size of the exposed surface, special attention should be paid to care for a concrete screed after its installation, which is similar to events described above.

With strict adherence to a fairly simple process conditions of the concrete structure is able to fulfil their function for many years, delighting their reliability not only you but also your grandchildren.


Article in other languages:

BE: https://tostpost.com/be/hatn-tul-nasc/21121-tehnalog-ya-zal-vannya-betonu.html

DE: https://tostpost.com/de/gem-tlichkeit/21136-technologie-gie-en-von-beton.html

ES: https://tostpost.com/es/la-comodidad-del-hogar/21150-la-tecnolog-a-de-relleno-de-hormig-n.html

KK: https://tostpost.com/kk/domashniy-uyut/21119-tehnologiyasy-beton-yu.html

PL: https://tostpost.com/pl/komfort-domu/21084-technologia-odlewania-betonu.html

PT: https://tostpost.com/pt/o-aconchego-do-lar/21089-a-tecnologia-de-concretagem.html

TR: https://tostpost.com/tr/domashniy-uyut/21125-teknoloji-beton-d-kme.html

UK: https://tostpost.com/uk/domashn-y-zatishok/21107-tehnolog-ya-zalivki-betonu.html






Alin Trodden - author of the article, editor
"Hi, I'm Alin Trodden. I write texts, read books, and look for impressions. And I'm not bad at telling you about it. I am always happy to participate in interesting projects."

Comments (0)

This article has no comment, be the first!

Add comment

Related News

Metal detector Minelab Go-Find 60: user reviews and features

Metal detector Minelab Go-Find 60: user reviews and features

Large and proven manufacturers often open experimental series, which were intended to test new options or combinations of characteristics, separately from the main line. Sometimes such tests of the market lead to decreasing trust ...

What can be planted in June without risking to be late on deadlines

What can be planted in June without risking to be late on deadlines

came the first month of summer. It happens that by this time some farmers desperate to harvest this season: no sooner had the man to plant all the desired vegetable crops. In vain! Many vegetables haven't left yet. And after 10 Ju...

Construction company

Construction company "VC": its activities and customer feedback

career and professional activities of the construction company "CDS" (center of shared construction) began in 1999. In the same year, the head of the construction company was enrolled in the “HGA”. Among...

The tillers from

The tillers from "KADVI": characteristics, Assembly

For all farmers and gardeners the most important is reducing labor costs and improving the efficiency of their own activities. In this regard, to perform a variety of tasks landowners actively using a special technique-motorized u...

How to calculate the area of the roof by yourself?

How to calculate the area of the roof by yourself?

Construction is an exact science, so during the construction of any building it is particularly important to correctly calculate the roof area. In our time, in order to facilitate this work, you can resort to using special electro...

The size of the shower pan. The types of shower trays (cast iron, steel, acrylic)

The size of the shower pan. The types of shower trays (cast iron, steel, acrylic)

In recent years, some prefer to not buy one piece shower, and all the elements separately that allows to make shower bath an individual. The most important part in a mixed shower block is the pan. Correctly selected the tray can b...