Three-phase meter "mercury 230": reviews and connection diagram

Date:

2019-07-15 03:20:35

Views:

754

Rating:

1Like 0Dislike

Share:

Table of contents:

The Meter "mercury-230" – this equipment which is designed to account for power and energy (reactive & active) in one/two directions in three-phase 3 - or 4-wire AC systems (50 Hz) by means of measuring transformers. It has the possibility of taking into account tariffs on zones of days, losses, and transmission of evidence and information on energy consumption via a digital interface channels.meter mercury 230

Specifications

The Meter "mercury-230" has the following specifications:

  • Dimensions & ndash; 258х170х74 mm.
  • Weight of the device – 1.5 kg.
  • The time interval between verifications – 120 months.
  • Mean time to failure – 150 000 hours.
  • The Average service life – 30.
  • Warranty period – 36 months.

Functionality

A three-phase meter "mercury-230" produce storage, measurement, recording, output to LCD display and then transfer at the interfaces of electrical energy (reactive & active) for each tariff separately and cumulatively over time periods for all rates:

  • When was dropped statements.
  • At the beginning and during the current day.
  • At the beginning and for the previous day.
  • At the beginning and for the current month.
  • At the beginning of and for each of the previous 11 months.
  • At the beginning and for the current year.
  • At the beginning and for the previous year.

three-phase meter mercury 230

Accounting Options

The Meter "mercury-230" is able to control 4 rates for 4 types of days in 16 timing zones of a day. Monthly this equipment is programmed in accordance with the individual rate schedule. Within days the minimum period of validity equal to one minute.

Also in power transformers and power lines can account for technical losses.

Measurements

Advanced meter "mercury-230" can be measured in a network of such options:

  • Instantaneous values of reactive, active and apparent power by phases total for each phase indicating the direction of the apparent power vector.
  • Frequency.
  • Phase Angles between voltages, current and voltage values of phase currents.
  • Control of the energy and capacity load transfer in high-impedance state pulse output at rising of settings.
  • Power Factors by phases total for each phase.meter mercury 230 art

Journals recording

In the logs is the following information:

Recommended

The most effective methods of seed germination

The most effective methods of seed germination

Despite the fact that the method of seedling in vegetable production is a very time consuming process, it is used by most gardeners. Planting seeds in open ground is an easy and convenient method, but it is effective only in certain climatic zones. I...

Retro-reflective paint. The scope of

Retro-reflective paint. The scope of

When the vehicle began to fill the road, their popularity began to gain reflective paint. Thanks to this paint, as drivers and pedestrians becomes much easier to avoid accidents in the dark. Purpose paint Reflective paint – paint material, whic...

How to make icon with your own hands - options izgotovleniya (simple and complex)

How to make icon with your own hands - options izgotovleniya (simple and complex)

In Soviet times, many collecting badges, emblems, pennants. To get them was not easy. And today, thanks to technology, you can make them yourself. Knowing how to make icon with your own hands, and you can make original gifts to your friends, and make...

  • A Time when a three-phase meter "mercury-230" on/off.
  • Ramp Time set limits of power and energy.
  • Adjustment of the tariff schedules.
  • The closing/opening of the instrument.
  • Time of appearance/disappearance of phases 1,2,3.

Interface

The electricity Meter "mercury-230" can be presented with the following interface:

  • PLC-I.
  • IrDA.
  • GSM.
  • CAN.
  • RS-485.

electricity meter Merkuriy 230

Information on the LCD indicator

Electric meter "mercury-230" displays on the LCD the following information:

  • Current date and time.
  • Network Frequency.
  • Power Factor total for three phases and for each of them.
  • Current and phase voltage in each phase.
  • Morning and Evening max reactive and active power in the three previous months in the current.
  • The Measured value of the total reactive and active powers (the integration period equal to one second) in total for three phases and for each readout quadrant, which remains the apparent power vector.
  • The Value of the consumed active and reactive electricity in total on all tariffs and for each of them cumulative. Measurement accuracy up to hundredths kVAr/h kW/h.

Direct connection

In this case, the counter is connected to the electric line. Installation is quite simple – it is only necessary to connect the input and output sides of the cable ends.

In this case, it is important not to confuse switching circuits:

  • Terminal No. 1 – enter “A”.
  • No. 2 terminal – the “A”.
  • Terminal # 3 – input “B”.
  • Terminal # 4 – the “B”.
  • Terminal # 5 – enter “C”.
  • Terminal # 6 – the “C”.
  • Terminal # 7 – input “zero”.
  • Terminal No. 8 – the “zero”.

meter mercury 230 am

In the process of installation should take into account all existing restrictions. Live broadcast, usually used in networks with a magnitude of the flowing current is not more than 100 A. Indirect calculations showed that the installed capacity of electricity consumers in this case must not be higher than 60 kW. The magnitude of the current flowing through the meter "mercury 230" Art, will be equal to 92 A in this volume of consumption.

If the apartment or house of a standard set of consumer devices – air conditioning, washing machine, TV and fridge – such wiring diagram of the metering device can be justified. If among consumers will be the boiler, it is preferable to select a different connection method.

Procosona wiring diagram

This option is used to connect with an installed capacity of electric energy consumption over60 kW. In this scheme, apply the current transformers, which is the time that the primary winding is replaced with an electric wire.

As a result of current flow in the secondary winding through a conductor, according to the laws of induction, is the electric voltage. The indicator voltage is fixed by a metering device. To calculate the amount of consumed energy is required the transformation ratio multiplied by the counter.

To Connect the meter "mercury-230" AM way on different circuits, each with current transformers will be used as a source of information.counter price mercury 230

Desativada connection scheme is considered the most common. Its main advantage is the presence of galvanic isolation of the measuring and power circuits. The disadvantage of this option is to connect the large amount of cabling.

The Sequence of connection of the meter and the transformer looks like this:

  • Terminal No. 1 – enter “A”.
  • No. 2 terminal – the inlet end of the measuring coil “A”.
  • Terminal # 3 – the “A”.
  • Terminal # 4 – input “B”.
  • Terminal # 5 – the inlet end of the measuring coil “B”.
  • Terminal # 6 – the “B”.
  • Terminal # 7 – enter “C”.
  • Terminal No. 8 – the inlet end of the measuring coil “C”.
  • Terminal No. 9 – the “C”.
  • Terminal No. 10 – input phase “zero”.
  • Terminal No. 11 – phase "zero" of the load.

Carrying out the installation of metering devices for connection to the circuit transformers, using special terminals designated L1 and L2.

Another option of connection of the meter using polyominos of the scheme – the reduction of current transformers in a configuration resembling a star. In this case, it facilitates the installation of the metering device, as installation requires fewer wires, this is achieved by complicating the internal circuitry. Such changes in no way affect the accuracy and quality of readings.

There is another option to connect using current transformers – semiprivate. Today it is completely outdated, despite the fact that it can be found in the real world. The main disadvantage is the lack of galvanic isolation of the measuring and process chains. This feature makes it dangerous to maintain.

For metering devices operating with the use of transformers, the regulations formulated special requirement: between the meter and the electrical wire you need to install the terminal block or panel, through which performs all the necessary connections.meter Merkuriy 230 connection

If necessary, the secondary winding is shunted, and the reference counter is connected to the measurement system. The presence of pad significantly facilitates installation. The equipment can be removed and replaced by another without turning off the main line of electricity.

Used in metering instrument transformers do not always have the specified parameters. After a certain time they should be checked.

It is Important to consider these details in the testimony. Polyolene wiring diagrams need extra attention. Marketing prefer to work with the devices of direct connection.

The Meter "mercury-230": indirect connection

This variant of connection of the metering device is not being used in the domestic sphere. The indirect scheme is designed for accounting of electric energy at the tire-generating businesses. These include nuclear, hydraulic and thermal power plants.

On the buses that depart from the generator, installed current transformers. The data from the terminals of transformers arrive at the metering device, fixing the amount of produced electrical energy. Last through the switchgear, the transmission lines, it comes to the online consumers.

Customer Testimonials

The Meter "mercury-230" (the price - from 3 000 rubles) is used for small business and domestic sector for metering the amount of electrical energy. Installing this equipment in rooms or closed cabinets, which provide additional protection from the adverse effects of environmental factors.

Consumers noted a number of positive aspects, characteristic of the metering device:

  • Compact size.
  • Small energy consumption.
  • Removal plombirovaniya part out.

Accounting and distribution of electric energy are complex, technical tasks. The wiring and installation of counters it is necessary to produce according to certain strict rules.


Article in other languages:

BE: https://tostpost.com/be/hatn-tul-nasc/35251-trohfazny-l-chyl-n-k-merkuryy-230-vodguk-shema-padluchennya.html

DE: https://tostpost.com/de/gem-tlichkeit/34922-dreiphasen-z-hler-mercury-230-bewertungen-und-anschlussplan.html

ES: https://tostpost.com/es/la-comodidad-del-hogar/34779-contador-trif-sico-el-mercurio-230-los-clientes-y-esquema-de-conexi-n.html

KK: https://tostpost.com/kk/domashniy-uyut/35548-sh-fazaly-sanauysh-merkuriy-230-p-k-rler-men-osu-shemasy.html

PL: https://tostpost.com/pl/komfort-domu/36651-tr-jfazowy-licznik-merkury-230-opinie-i-schemat-pod-czenia.html

PT: https://tostpost.com/pt/o-aconchego-do-lar/36450-trif-sico-contador-de-merc-rio-230-coment-rios-e-esquema-de-liga-o.html

TR: https://tostpost.com/tr/domashniy-uyut/31970-fazl-saya-merk-r-230-g-r-ler-ve-ba-lant-emas.html

UK: https://tostpost.com/uk/domashn-y-zatishok/35775-trifazniy-l-chil-nik-merkur-y-230-v-dguki-ta-shema-p-dklyuchennya.html






Alin Trodden - author of the article, editor
"Hi, I'm Alin Trodden. I write texts, read books, and look for impressions. And I'm not bad at telling you about it. I am always happy to participate in interesting projects."

Comments (0)

This article has no comment, be the first!

Add comment

Related News

Rack ceiling in a bathroom - how to make the right choice?

Rack ceiling in a bathroom - how to make the right choice?

to begin to repair in your apartment, you should think in advance how to choose a ceiling. Particularly acute this issue is for the bathroom. Constant temperature changes and high humidity levels can adversely affect many types of...

Farm: types of farms, description, classification and working principle

Farm: types of farms, description, classification and working principle

the construction of the farm cover a different scope, addressing mechanical power and frame subassemblies. In essence, they represent the core of the system, which, depending on operating conditions may provide different degrees o...

The root system of the arborvitae: features, photos, dimensions

The root system of the arborvitae: features, photos, dimensions

Most gardeners when choosing evergreen conifers prefer to unpretentious and very beautiful tree - Thue. In appearance thuja has a similarity with its closest relatives: juniper and cypress. It is characterized by a pyramidal shape...

When to transplant a gooseberry: features, technology and reviews

When to transplant a gooseberry: features, technology and reviews

Gooseberries almost every suburban area. This shrub is not particular care annually and pleased gardeners with sweet berries, of which it is possible to prepare jam, jams and compotes. However, sooner or later, the gooseberry tran...

How to make a gun out of LEGO? Will figure it out together

How to make a gun out of LEGO? Will figure it out together

Want to make a child pleasant? This, of course, will be about the boys. Because they're available to purchase both fascinating and thought-provoking and imagination of the designer “LEGO-gun”.the long-Awaited saleAnd h...

Bearded iris: planting and care

Bearded iris: planting and care

bearded iris can be seen in almost any garden plot – in the flower bed or flower garden. Bearded iris, planting and care of which you do not bring a lot of trouble and do not require special skills and craftsmanship, is quit...